Falcon Construction

DSCN2682

Falcon Construction Project 1

New modern systems were implemented such as IP CCTV, intrusion, induction loop and disabled toilet alarm systems. For the mechanical works, ventilation systems (AHU with galvanized ducts, centrifugal fans for bathrooms with flex ducts, fire damper crosstalk-attenuator and volume control damper). Air conditioning and heating system consisting of VRF, Multi A/C units, and water heater were installed.  All materials were imported from the UK and implemented by our expert engineers.